Abstract
This study used historical data from a Park & Ride facility in Amsterdam to build a validated computer (Python) model to optimize battery and grid connection sizing. The case study modelled is equipped with 8 EV chargers (16 connections), an on-site supplementary battery, and a limited capacity grid connection. This model was then used to optimize the battery energy storage capacity and grid connection capacity for minimal annualized investment, using a future proof monthly load profile. A variety of battery control strategies were simulated using both the optimal system sizing and the current system sizing. The results were compared and a recommended control strategy presented, considering a number of performance metrics.
| Original language | English |
|---|---|
| Pages | 1-12 |
| Publication status | Published - 11 Jun 2023 |
| Event | Electric Vehicle Symposium 36 - Sacramento, United States Duration: 11 Jun 2023 → 14 Jun 2023 https://evs36.com/ |
Conference
| Conference | Electric Vehicle Symposium 36 |
|---|---|
| Abbreviated title | EVS36 |
| Country/Territory | United States |
| City | Sacramento |
| Period | 11/06/23 → 14/06/23 |
| Internet address |
Fingerprint
Dive into the research topics of 'Battery Supported Electric Vehicle Charging Plaza Using a Limited Capacity Grid Connection'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver