| Original language | English |
|---|---|
| Title of host publication | Proceedings of Winter Simulation Conference |
| Publication status | Published - 3 Dec 2017 |
| Event | Winter Simulation Conference - Las Vegas, United States Duration: 3 Dec 2017 → 6 Dec 2017 |
Conference
| Conference | Winter Simulation Conference |
|---|---|
| Abbreviated title | WSC |
| Country/Territory | United States |
| City | Las Vegas |
| Period | 3/12/17 → 6/12/17 |
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver